Installation & Commissioning
Coordinate machine placement, utilities, first-run checks, software setup, and acceptance records before daily operation begins.
Lithostek supports installation, calibration, operator training, spare parts, software guidance, remote diagnostics, and long-term maintenance for bitumen, asphalt mix, concrete, cement, thermal analysis, soil, aggregate, rock mechanics, and mechanical testing systems.
Coordinate machine placement, utilities, first-run checks, software setup, and acceptance records before daily operation begins.
Support load, displacement, temperature, timing, and sensor verification with documentation for ASTM, EN, ISO, and AASHTO workflows.
Identify molds, fixtures, seals, sensors, grips, cutters, heating elements, and other replacement parts by equipment model.
Review symptoms, settings, photos, videos, test curves, and software data so engineers can guide troubleshooting remotely.
Materials testing equipment is not a one-time transaction. Lithostek keeps the laboratory workflow stable through commissioning, training, calibration support, troubleshooting, parts supply, and maintenance review.
Confirm configuration, accessories, manuals, calibration records, packing list, and factory acceptance checks.
Guide positioning, power, air supply, water supply, environmental requirements, and commissioning sequence.
Train laboratory teams on specimen preparation, machine operation, safety routines, reporting, and maintenance basics.
Support test setup, software parameters, abnormal readings, data export, and repeatability checks.
Help laboratories plan verification intervals, document traceability, and prepare compliance records for audits.
Assist with preventive maintenance, replacement parts, firmware or software updates, and long-term equipment upgrades.
These support paths keep searchable material keywords on the page while routing customers toward the right equipment category and service topic.
Penetration, ductility, softening point, DSR, BBR, RTFO, PAV, viscosity, and binder aging systems.
Gyratory compactors, wheel trackers, fatigue systems, extraction systems, and specimen preparation equipment.
Compression machines, curing systems, fresh concrete testing, molds, NDT systems, and durability equipment.
Mortar strength, Vicat, setting time, flow table, cement preparation, molds, and curing equipment.
DSC, TGA, STA, DTA, thermal conductivity, carbon black content, and dispersion testing instruments.
Triaxial, consolidation, direct shear, compaction, CBR, permeability, sensors, and data acquisition systems.
Sieving, sample splitting, shape analysis, abrasion, polishing, impact, crushing, and density workflows.
Rock preparation, UCS, triaxial rock testing, point load testing, and high-rigidity loading systems.
Universal testing machines, servo-hydraulic UTM platforms, electromechanical testers, compression frames, and automated testing systems.
Clear equipment information helps the engineering team identify the platform, verify accessories, diagnose symptoms, and respond with the right documentation or parts recommendation.