ASPHALT MIX

Automatic Marshall Compactors for Asphalt Specimens

Lithostek automatic Marshall compactors prepare 101.6 mm and 152.4 mm asphalt specimens through controlled hammer weight, drop height, blow rate, and cycle counting. Compare LS-MS10 and LS-MS20 for ASTM D6926, AASHTO T245, and EN 12697-30 laboratory workflows.

Available Products

2 products in this category

Marshall Compactor Selection

Compare LS-MS10 and LS-MS20

Both systems automate hammer lifting, blow counting, and cycle shutdown for 101.6 mm and 152.4 mm Marshall specimen configurations. LS-MS20 adds automatic mould clamping, programmable presets, and phase-sequence protection for laboratories with higher throughput.

Standard automatic platform

Specimen
101.6 / 152.4 mm
Hammer
4.536 / 10.210 kg
Drop
457.2 ± 1.5 mm
Rate
60 ± 5 blows/min
Control
Industrial touchscreen and automatic cycle stop

Automatic lift and mould clamping

Specimen
101.6 / 152.4 mm
Hammer
4.536 / 10.210 kg
Drop
457.2 ± 1.5 mm
Rate
60 ± 5 blows/min
Control
5" LCD, presets up to 999 blows, phase protection

Confirm the governing method edition, hammer assembly, mould configuration, blow count, power supply, and included accessories before ordering.

Standards & Project Configuration

Available configurations support the following published workflows. Confirm the applicable method edition, specimen format, hammer assembly, blow count, power supply, and requested documentation before ordering.

ASTM D6926

AASHTO T245

EN 12697-30

Frequently Asked Questions

Ready to Find Your Solution?

Our experts can help you select the perfect mix design & specimen preparation equipment for your specific needs.

Get A Quote
RETURN TO TOP ↑